BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 4 PDF

BHEL Haridwar block 2 heavy fabrication, training report Summer Training Project Report on EMPLOYEE MOTIVATION OF BHEL EMPLOYEES. This project report has been made as a part of the industrial training the least; I would like to thank all the staff members of B.H.E.L. Block-4, Ranipur, Haridwar. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-4 CIM (Coil & Insulation Manufacturing) & ACG (Apparatus control Gear) v. .. undertaken summer training in Bharat Heavy Electricals Limited, Haridwar.

Author: Mooguzilkree Voodoorr
Country: Tunisia
Language: English (Spanish)
Genre: Medical
Published (Last): 1 June 2011
Pages: 101
PDF File Size: 10.55 Mb
ePub File Size: 6.36 Mb
ISBN: 493-9-24592-943-6
Downloads: 76200
Price: Free* [*Free Regsitration Required]
Uploader: Sara

Each blade is screwed at its root with a threaded pin. The company has repkrt earning profits continuously since 72 and paying dividends since which is a reflection of company’s commendable performance throughout. Bearing have provision for vibration pickup to monitor shaft vibration.

The repott placed over the winding should be such that they make half overlap with next wrapping of the tape. AC ammeter ampere 4. Dhiman, deputy manager for his prodigious guidance throughout my training and I would specially like to thank Mr.

We think you have liked this presentation. The pressing of overhang portion is carried out on special ring type hydraulic press, whereas slot reoort is pressed manually with the help of slot wedges. Seamless Steel Tubes xiii. Hariidwar approximate area of these plant is a follows: Wind Electric Generators vi. All AC machines rated for more than 5 MVA or with armature core longer the machine is to be provided with at least 6 resistance thermometers of their couples which shall built inside the stator suitably distributed among the circumference at the likely hottest point.

Core is stacked with lamination segments. The company has been earning profits continuously since and paying since Hydro Power Plant ix.

  BION ATTACKS ON LINKING PDF

This help BHEL to keep pace with the worldwide technological progress and offer state of the art equipment to its customer. Vinod Bharadwaj and Mrs. The core loss test is done after completion of core assembly.

To ensure that core losses are within limits and there are no hot spots present in the core. Provide indication to the operator about the condition of the gas inside the machine i.

This happens with the help of AVR regulator which means automatic voltage regulator. To reduce the stray losses and have high strength, the rings are made up of non-magnetic cold worked material. A strong engineering base enables the Company to undertake turnkey delivery of electric substances up to kV level series compensation systems for increasing power transfer capacity of transmission lines and improving system stability and voltage regulationshunt compensation systems for power factor and voltage improvement and HVDC systems for economic transfer of bulk power.

Thermal Power Station Plant. Electrostatic precipitationAir preheaterFansWind electric generatorsDesalination plants. To ensure that strands are firmly bonded together and give dimensionally stability in slot portion, a layer of glass tape is wrapped over the complete stack.

Each slots accommodated two bars. These spacers from ventilating ducts where the cold hydrogen from gas coolers enter the core radially inwards there by taking away the heat generated due to eddy current losses. Click here to sign up.

But the temperature must not be allowed to become too high, otherwise difficulties will be experienced with insulation. One end of each ring is shrunk fitted on the rotor body while the other hand overhangs the end winding without contact on the rotor shaft.

hlock The architecture of B. The shrunk on hub on the end of the retaining ring serves to reinforce the retaining ring and serves the end winding in the axial direction. The main AC voltage of generator is finally available to turbo generator stator.

  LG CU400 MANUAL PDF

INDUSTRIAL TRAINING AT BHEL, HARIDWAR – ppt video online download

The inner cage is usually fixed in the yoke by an arrangement of spring to damper the double frequency vibrations inherent in two pole generator. To prevent damage to the journal due to shaft current, bearings and coil piping on either side of bhrl non-drive and bearings are insulated from the foundation frame.

Test procedure for measurement of leakage reactance of TG stator winding — SCOPE — This procedure covers the leakage reactance measurement of stator winding after completion of winding. The press ring is bolted to the ends of core bars. Electrical Machines Block In block 1 turbo generator and exciter are manufactured.

Insulation life endurance test assessment facility.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

Remember me on this computer. Its operations are spread over 11 manufacturing plants and number of engineering and service divisions located across the country. Kollmann rotor slot milling machine up to maximum barrel length of mm, barrel diameter of mm and rotor weight of tones. BHEL is the only company in India with the capability to make simulators for power plants, defense and other application 1.

L Haridwar plant, Uttarakhand. Seamless Steel Tubes xi. The project would not have been possible without the help and cooperation of the aforementioned officials.